For a transformer to be tested at full load conditions but consuming only losses horn the mains, we do | |
A. | load test. [Wrong Answer] |
B. | open-circuït and short-circuit tests. [Wrong Answer] |
C. | back-to-back test. [Correct Answer] |
D. | none of the above. [-5. [Wrong Answer] |