Users Also Read
MCQ's Search Engine
Electrical Engineering
Mechanical Engineering
Civil Engineering
Automobile Engineering
Chemical Engineering
Computer Engineering
Electronics Engineering
Medical Science Engg
Pick up the correct statement from the following. | |
A. | In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal [Wrong Answer] |
B. | In a level crossing a regulator is provided across the drainage at its down-stream [Wrong Answer] |
C. | In a level crossing, a cross regulator is provided on the canal below the crossing [Wrong Answer] |
D. | All the above. [Correct Answer] |