While performing the open-circuit antI short-circuit tests on a transformer to determine parameters the status of the low voltage (LV) and high voltage (HV) wiridings will be such that | |
A. | in OC, LV is open and in SC HV is shorted. [Wrong Answer] |
B. | in OC, HV is open and in SC LV is shorted. [Correct Answer] |
C. | in OC, LV is open and in SC LV is shorted. [Wrong Answer] |
D. | In OC, HV is open and in SC HV is shorted. [Wrong Answer] |