Users Also Read
Read MCQ's/Objective questions
MCQ's Search Engine
Compressors,Gas Turbine & Jet Engn
Engineering Materials
Engineering Mechanics
Heat Transfer
Internal Combustion (I.C.) Engine
Machine Design
Nuclear Power Plants
Hydraulic Machines, Fluid Mechanics
Hydraulic Machines
Fluid Mechanics
Process Instrumentation and Control
Production Technology
Refrigeration and Air Conditioning
Steam Boiler,Engine,Nozzle & Turbine
Strength of Materials
Theory of Machines
Thermodynamics
Workshop Technology
Applied Mechanics
Automobile Engineering
General Engineering
Engineering Methodology / Meterology
Home⇒ Engineering⇒
Production industrial engineering management
1-Dont try to cram or spend more time here just read it fast and cover syllabus then practice MCQ's cheptor of same topic to check your progress. . |
2-Wrong options are also given but dont concentrate there, Right answer is in bold format. |
Q21 ⇒ The main advantage of line organisation is its all of the above. [other wrong options] [Discuss in forum] effective command and control defined responsibilities at all levels rigid discipline in the organisation ability of quick decision at all levels |
Q22 ⇒ Frederick W. Taylor introduced a system of working known as functional organisation [other wrong options] [Discuss in forum] line organisation line and staff organisation effective organisation none of the above. |
Q23 ⇒ The salient feature of functional organisation is all of the above. [other wrong options] [Discuss in forum] strict adherence to specification separation of planning and design part each individual maintains functional efficiency work is properly planned and dis-tributed |
Q24 ⇒ The most popular type of organisation used for Civil Engineering Constructions is line organisation [other wrong options] [Discuss in forum] line and staff organisation functional organisation effective organisation none of the above. |
Q25 ⇒ Templates are used for a planning layout [other wrong options] [Discuss in forum] flow of material advancing a programme in automatic machines copying complicated profiles none of the above. |
Q26 ⇒ In steel plant the most improtant system for materials handling is locos [other wrong options] [Discuss in forum] conveyors cranes and hoists trucks none of jhe above. |
Q27 ⇒ Routing prescribes the flow oftnaterial in the plant [other wrong options] [Discuss in forum] proper utilization of man power proper utilization of machines inspection of final product none of the above. |
Q28 ⇒ Queuing theory deals with problems of reducing the waiting time or idle Jajme [other wrong options] [Discuss in forum] material handling better utilization of man services effective use of machines none of the above. |
Q29 ⇒ Standard time is defined as normal time + allowances [other wrong options] [Discuss in forum] normal time + idle time + allowances normal time + idle time only normal time for an operation none of the above. |
Q30 ⇒ Father of industrial engineering is Gnatt [other wrong options] [Discuss in forum] Jeck Gilberth Taylor Newton none of the above. |
Q31 ⇒ The grouping of activities into organisational units is called departmentatidn [other wrong options] [Discuss in forum] corporate plans higher level management functional authority company policy. |
Q32 ⇒ Which of the following organisation is preferred in automobile industry line and staff organisations [other wrong options] [Discuss in forum] functional organisation line organisation staff organisation scalar organisation. |
Q33 ⇒ Which of the following organisations is best suited for steel plants functional organisation [other wrong options] [Discuss in forum] line organisation staff organisation line, staff and functional organisations scalar organisation. |
Q34 ⇒ The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store inflated system [other wrong options] [Discuss in forum] primary cost method current value method fixed price method variable price method. |
Q35 ⇒ Which of the following is independent of sales forecast productivity [other wrong options] [Discuss in forum] inventory control production planning production control capital budgeting. |
Q36 ⇒ Gnatt charts are used for production schedule [other wrong options] [Discuss in forum] forecasting sales scheduling and routing linear programming none of the above. |
Q37 ⇒ Inventory management consists of all of the above [other wrong options] [Discuss in forum] effective running of stores state of merchandise methods of stroing and maintenance etc. stock control system none of the above. |
Q38 ⇒ Gnatt charts provide information about production schedule [other wrong options] [Discuss in forum] break even point analysis material handling layout determining selling price value analysis. |
Q39 ⇒ Inventory control in production, planning and control aims at acceptable customer service at low capital investment in inventory [other wrong options] [Discuss in forum] achieving optimization ensuring against market fluctuations discounts allowed in bulk purchase regulate supply and demand. |
Q40 ⇒ In inventory control, the economic order quantity is the optimum lot size [other wrong options] [Discuss in forum] highest level of inventory lot corresponding to break-even point capability of a plant to produce none of the above. |