64. A model of a reservior is drained in 4 mts by opening the sluice gate. The model scale is 1: 225. How long should it take to empty the prototype ? | |
A. | 900 minutes [Wrong Answer] |
B. | 4 minutes [Wrong Answer] |
C. | 4 x (225)3/2 minutes [Wrong Answer] |
D. | 4 (225)1/3 minutes [Wrong Answer] |
E. | 4 x V225 minutes. [Correct Answer] |