Users Also Read
MCQ's Search Engine
Electrical Engineering
Mechanical Engineering
Civil Engineering
Automobile Engineering
Chemical Engineering
Computer Engineering
Electronics Engineering
Medical Science Engg
Select the incorrect statement. | |
A. | Stop or red time of a signal is the sum of go and clearance intervals for the cross flow. [Wrong Answer] |
B. | Go or green time of a signal is the sum of stop and clearance intervals for the cross flow. [Correct Answer] |
C. | Clearance time is generally 3 to 5 seconds. [Wrong Answer] |
D. | The cycle length is normally 40 to 60 seconds for two phase signals. [Wrong Answer] |