Users Also Read
MCQ's Search Engine
Electrical Engineering
Mechanical Engineering
Civil Engineering
Automobile Engineering
Chemical Engineering
Computer Engineering
Electronics Engineering
Medical Science Engg
The formation width for double line B.G. track is cutting excluding side drains takes as | |
A. | 7.01 m [Wrong Answer] |
B. | 7.93 m [Wrong Answer] |
C. | 10.06 m [Correct Answer] |
D. | 10.82 m [Wrong Answer] |