The overshoot and the settling time are maximum with : | |
A. | underdamped system [Correct Answer] |
B. | overdamped system [Wrong Answer] |
C. | critically damped system [Wrong Answer] |
D. | damped system [Wrong Answer] |
E. | non damped system. [Wrong Answer] |