Positive slack on a PERT indicates that project is | |
A. | ahead of schedule [Correct Answer] |
B. | beyond schedule [Wrong Answer] |
C. | as per schedule [Wrong Answer] |
D. | on critical path [Wrong Answer] |
E. | none of the above. [Wrong Answer] |