Pessimistic time is | |
A. | the maximum time which an activity might require [Correct Answer] |
B. | the average time required for a job [Wrong Answer] |
C. | the most probable time considering all conditions [Wrong Answer] |
D. | the minimum time in which an ac¬tivity can possibly be accomplished [Wrong Answer] |
E. | the earliest finish. [Wrong Answer] |