The time which results in the least possible direct cost of an activity is known as | |
A. | normal time [Wrong Answer] |
B. | slow time [Correct Answer] |
C. | crash time [Wrong Answer] |
D. | standard time [Wrong Answer] |
E. | none of the above. [Wrong Answer] |